Different sand method of construction procedures and parameters are different , here focuses on several commonly used chemical sand oilfield construction procedures and parameters .
Phenolic resin solid construction sand and construction process parameters
( A ) perforating : vacuum perforating hole density of 20 holes / m, pore size of not less than 10mm.
( 2 ) wash well : there is no solid well fracking phase with a plus cleaning liquid clay anti-swelling agent, emulsifier and anti- flushing .
( 3 ) through well : with less than 4-6 mm casing diameter wells regulatory pass through to the lower bound of the following reservoir 20m, no Difficult phenomenon .
Anti ( 4 ) under the sand column : Full Wells once sand , light pipe above the upper boundary of the reservoir was completed in 5 ~ 10m, installed wellhead for construction ; multi- layered reservoir sand Nagai segment , using the first down into the packer , from under the previous paragraph by paragraph, sand , each segment length control wells within 20 m.
( 5 ) being extruded activity Diesel : Diesel ceramic proppant was added 1% of polyoxyethylene alkyl ether -8 active agents, i.e. the activity of diesel oil in an amount of not less per m perforation 500 L, CC 300 L / mim.
( 6 ) being squeezed hydrochloric acid : hydrochloric acid concentration of 5% to 7 % per meter reservoir perforation less than 200 L, displacement 300L/min.
( 7 ) being squeezed diesel : the amount of 2m, displacement 300L/min.
( 8 ) being squeezed phenolic resin solution : oil per meter perforation less than 200 L, displacement 300L/min.
( 9 ) n- extrusion pore former ( diesel ) : the amount of resin in an amount of 2 to 3 times the displacement 300L/min.
( 10 ) n- extrusion curing agent ( HCl ) : HCl concentration of 10% to 12%, an amount of 2 to 3 times the amount of resin , the displacement 300L/min.
( 11 ) are squeezed replace liquid ( diesel ) : All hydrochloride squeeze oil displacement 300L/min.
( 12 ) shut Hou Ning 48h or more.
( 13 ) kill , resin surface exploration drilling plug to artificial bottom.
( 14 ) down into the production string production.
Luoyang Maide Ceramics Co., Ltd. (frac sand companies)is located in Peony Capital – Luoyang City, China. Taking full advantages of the local experienced expertise, rich bauxite resources and mature technology, we devote ourselves to the production and development of fracturing proppant.
Showing posts with label well fracking. Show all posts
Showing posts with label well fracking. Show all posts
Monday, January 20, 2014
Wednesday, January 8, 2014
Proppant pressure in the closed state
According to the strength of the proppant , the relative relationship between the hardness , the hardness of the rock wall and the closing pressure (close pressure) , the pressure in the closed ceramic proppant has three states .
1 ) proppant embedment formations . If proppant harder than rock hardness , fracture surface embedded proppant , thereby reducing support crack width, reduce fracture conductivity .
2 ) proppant was crushed. If the hardness is less than the proppant rock hardness and compressive strength of the proppant to be smaller than the closing pressure , the proppant is crushed. This not only reduces the propped fracture width , and because of the mutual -embedded proppant crushing support also reduces the fracture permeability , thereby reducing the fracture conductivity .
3 ) proppant compressive deformation. For toughness well fracking, pressure in the closed first ductile deformation proppant increased bearing area , thereby increasing the bearing capacity without proppant crushing . Thus , although the use of toughness proppant proppant fracture width is reduced , but the broken particles do not exist, so there is still a relatively high fracture conductivity .
1 ) proppant embedment formations . If proppant harder than rock hardness , fracture surface embedded proppant , thereby reducing support crack width, reduce fracture conductivity .
2 ) proppant was crushed. If the hardness is less than the proppant rock hardness and compressive strength of the proppant to be smaller than the closing pressure , the proppant is crushed. This not only reduces the propped fracture width , and because of the mutual -embedded proppant crushing support also reduces the fracture permeability , thereby reducing the fracture conductivity .
3 ) proppant compressive deformation. For toughness well fracking, pressure in the closed first ductile deformation proppant increased bearing area , thereby increasing the bearing capacity without proppant crushing . Thus , although the use of toughness proppant proppant fracture width is reduced , but the broken particles do not exist, so there is still a relatively high fracture conductivity .
Subscribe to:
Posts (Atom)